Stability control, safety assessment and rehabilitation of dams and appurtenant installations

Magab Ghodss Consulting Engineering Company enjoying competent experts at safety assessment and stability control, study and supervision on rehabilitation schemes of dams and appurtenant installations is taking an active role in the following.

  • Stability control studies and safety assessment of dams and appurtenant installations.
  • Studies and supervision of rehabilitation schemes and height rise of dams.
  • Studies into flood control, sedimentation and failure of dams.
  • Preparation and update of procedures in maintaining and operating dams and powerhouses.
  • Supervision over maintenance and operation of dams and powerhouses.
  • Safety studies of dam reservoirs.


  • A) Stability control studies and safety assessment of dams and appurtenant installations

    Stability control of dams in Iran (phase I: 14 earthfill and concrete dams and phase II: 20 earthfill and concrete dams), Marun dam, Rajaei dam, Karhkeh (Hamidieh) regulation-diversion dam, Dez dam, Abbasspour (Karun I) dam, Karun III dam, Upper Gotvand dam, Karun IV dam.




  • B) Studies and supervision of rehabilitation schemes and height rise of dams

    Repair and treatment of Abbasspour (Karun I) dam spillway, cracks of blocks 10 and 11 of main dam of Latian and settlement of Latian – Kalan road, Karkheh (Hamidieh) regulation-diversion dam, buttress 11crack of Sefid Roud dam, Mahabad dam, Maku (Barun) dam, Golpaygan dam and power plant, plunge pool and lateral stabilization of Abbasspour (Karun I) dam spillway, treatment of power intakes of Abbasspour (Karun I) dam, control of pipes in upstream of Vahdat (Gheshlagh) dam, protection of space between two buckets and lateral stabilization of Abbasspour (Karun I) dam, stabilization and consolidation of right abutments of main dam and Latian regulation dam, outlets of Jiroft dam, repair of Sefid Roud dam, water tightening of Abshineh dam, water installations in Ardebil province (34 regulation dams), treatment and rehabilitation of intake system of Zarrineh Roud dam, partial rehabilitation of Ghuri Chai dam installations and network, repair and reconstruction of Minab (Esteghlal) dam spillway, rehabilitation of Lar dam and height rise of Fariman dam, Zarrineh ROud dam and of Choghakhor dam.



  • C) Studies into flood control, sedimentation and failure of dams

    Construction of new silt ejector of Dez dam, landslide in reservoir area of main dam of Latian


  • D) Preparation and update of procedures in maintaining and operating dams and powerhouses

    Rajaei dam, Marun dam, Alavian dam, Reis Ali Delvari dam, Mahabad dam, Taham dam, Golabar dam, Ilam dam, Tangoeyteh dam, Maku dam, Alborz dam, Talvar dam, Jegin dam.


  • E) Supervision over maintenance and operation of dams and powerhouses

    Karun III dam, Upper Gotvand dam and Karun IV dam.