CONSOLIDATED

PRESENCE IN

OVER 25 COUNTRIES

25

International

Project






INTERNATIONAL PROJECTS LIST

No

Name

Country

Client

Date

Main Features

Status

1

Consulting services for Design Review, Construction Supervision, Quality Control & Contract Management for Construction of Head-works, Surge Shafts, Penstock and Power house

Nepal

Public Authority for Water

2019-Today

- Height of concrete barrage: 15 m

- Installed capacity: 46.72 MW

- Total annual energy to be generated: 384.51 GWh

In Progress

2

Consultancy Services for Feasibility Study of a Mini-hydropower Plant at Osborne Dam

Zimbabwe

Manako Power

2018-Today

- Dam type: Zoned earth-fill

- Dam height: 66 m

- Crest length: 1007 m

Completed

3

Design Review & Construction Supervision of Ilesa Integrated Water Supply and Sanitation Project

Nigeria

Osun State Water Corporation

2017-Today

Water Treatment Plant

- Capacity: 60,000m3/day

Conveyance pipeline

- Pipeline: 32.4 km with Diameters of 400, 600, 800 mm

In Progress

4

Feasibility Studies for Mega Irrigation Schemes around Mt. Elgon Area and Design of Amagoro and Nabigaga Irrigation Schemes in Tororo and Kamuli Districts (Lot 1)

Uganda

Ministry of Water and Environment

2018-Today

- Command area: 3,200 hectares

- Dam type: earth-fill

- Dam height: 25 m

In Progress

5

Design Review and Construction Supervision of Contract Titled

“Plant Design, Supply and Installation of St. Sebastian North Lock Gates and Pump Station

Sri Lanka

Ministry of Urban Development Project Management Unit- Metro Colombo Urban Development

2017- 2020

- Total direct pump capacity: 30.0 m3/s

- Gate structure: 2 Nos. 7.5m x 6.2m sliding gate

In Progress

6

Construction Supervision of Moragahakanda Dam & Hydropower Plant

Sri Lanka

Ministry of Irrigation and Water Management of the Democratic Socialist Republic of Sri Lanka

2015-2016

- Main Dam:Earth Core Rock fill Dam, Max. height: 62.3 m, 

- Saddle Dam: Roller compacted concrete gravity dam, Max. height: 50.5 m, 

- Power House : 4 Units - 10 MW (2*5 MW)

Completed

7

Engineering General Layout, Feasibility Studies, Detailed Design, Construction Supervision and Management of Uma Oya Dam and Hydropower Plant

Sri Lanka

Ministry of Irrigation and Water Management of the Democratic Socialist Republic of Sri Lanka

2015-2016

Puhulpola Dam (Uma Oya River)

- Dam Type: RCC

- Dam Height: 35 m

Dyraaba Dam ( Mahatotila River)

- Dam Type: RCC

- Dam Height 50 m

- Installed capacity: 2 × 60 MW

Completed

8

Detailed Design and Construction Supervision of Kaluganga Dam & Hydropower Plant

Sri Lanka

Ministry of Irrigation and Water Management of the Democratic Socialist Republic of Sri Lanka

2014-2015

- Main Dam: Rockfill with central core,Max. height: 68 m

- Saddle Dam: Rockfill with central core,Max. height: 28m

Completed

9

Detailed Design Review and Construction Supervision of BajoliHoli Dam & HPP

India

Gmr Bajoli Holi Hydro Power Pvt. Ltd

2014-2018

- Dam type: Concrete Gravity

- Dam height: 63m

- Installed capacity: 180 MW - 3 Nos. 60 MW

- Diversion tunnel diameter: 5.6 m (length: 355 m)

Completed

10

Construction of Access Controlled Nagpur - Mumbai Super Communication Expressway (Maharashtra SamruddhiMahamarg)in From Km. 390.445 to Km. 444.485

India

Gmr Bajoli Holi Hydro Power Pvt. Ltd

2014-2018

- Number of tunnels 2

- Tunnel Diameter 9.7 m

- Tunnel Length 267 m

In Progress

11

Design Review & Construction Supervision of Madinat Al Nahdah Flood Protection B4.1.1 / B4.1.2 DAM In WadiAday, Muscat Governorate

Sultanate of Oman

Ministry Of Regional Municipalities & Water Resources

2019-Today

Dam B4.1.1 comprises of 2 individual earth-fill dams

- A main earth fill dam (MD), 22m high

Dam B4.1.2 dam comprises in fact 3 individual earth-fill dams

- A main dam (MD), 20m high

Contract Negotiation

12

Feasibility Study, Detailed Design & Construction Supervision of Flood Control Dam Scheme in SALALAH Free Zone, Raysut Area, Dhofar Governorate, Sultanate of Oman

Sultanate of Oman

Ministry Of Regional Municipalities & Water Resources

2014-2017

Five earth-fill with asphalt Core dams as following:

Adawnib Dam (A1b) - Max. Dam Height : 68 m

Adawnib Dam (A3a ) - Max. Dam Height : 31 m

Annar Dam (N1-Alt2) - Max. Dam Height :20 m

Qaftout Dam (QL-2) - Max. Dam Height :35 m

Gardhom Dam (QR-3b) - Max. Dam Height :65.5 m

In Progress

13

Construction Supervision of Sang Tude II Dam & Hydropower Plant

Tajikistan

Sangab Company

2006-2011

- Dam type: Rock fill with Clay core

- Dam height 33.5 m

- Installed Capacity: 220 MW

Completed

14

Feasibility Studies and Surveying Engineering for Ayni Dam & Hydropower Plant

Tajikistan

Farab Co.

2010-2011

- Dam type:concrete arch dam and RCC

- Dam height: 90m

- Installed capacity:160–190 MW

Completed

15

Feasibility Study of Kama Irrigation and Diversion Dam and Hydropower Plant

Afghanistan

Islamic Republic Of Afghanistan Ministry of Energy & Water

2008-2010

Dam

- Dam Height: 7.5m

- Installed Capacity of powerhouse : 45 MW

Water conveyance system

- Length: 16.7 KM

- Discharge capacity: 125 m3/s

- Number of tunnels: 4 (Diameter 7.8 m)

Irrigation and drainage network

- Command area: 5128 ha

Completed

16

Design Review and Construction Supervision for Reconstruction of Minge chevir Hydroelectric Power Plant Cascade and Varvara HPP

Azerbaijan

Azerenergi Joint Stock Company

2008-2010

- Replacement of two 60 MW units with the new 70 MW units in Mingachevir HPP

- Reconstruction of Varvara HPP increasing its capacity up to 21-22 MW

Completed

17

Geotechnical, Surveying, Meteorological and Hydrological Studies of Jiploo Dam & Hydropower Plant

Equatorial Guinea

ICON International Engineering and Contracting Group

2002-2004

- Dam type: Gravity

- Dam height: 22 m

- Installed Capacity: 45 MW (3 × 15 MW)

Completed

18

Technical Design of Water Intake at Tigris River and Aindeevar Main Pump Station

Syria

The General Company For Hydraulic Studies of Syria

2008-2010

- Commanding 150,000 hectares of irrigable land

- Lifting head of 108m to an open canal of AinDeewar with the same capacity and 20.5 km length, to convey water

- Lifting head of 63m from Al-Malkiahstation

Completed

19

Revising Geological and Hydro geological Studies of Al-Hussein Dam

Syria

General Company For Hydraulic Studies (GCHS Ltd.)

2007-2009

- Dam Type: Earth fill dam with clay core

- Dam Height: 68m

Completed

20

Detailed Design for Rehabilitation and Refurbishment of Al gharaffeh Pump Station and Reservoir Facilities

Qatar

Ministry of Electricity and Water

1995-1999

- The network covers an area of more than 5,860,000sqms

- The Network in consisted of 65Km main pipe and 2,360 manholes

Completed

21

Detailed Design for Rehabilitation and Refurbishment of Old Airport Reservoir – Al Wakrah

Ministry of Electricity and Water

1995-1999

- Construction of 0.5 Million Gallons capacity water Tower

- Tanker filling station of 12 point, extendible to 24 points

Completed

22

Detailed Design and Construction Supervision for Rehabilitation of Korca Irrigation & Drainage Network

Albania

Ministry of Agriculture & Food

2011-2014

- Rehabilitation of 7000 hectares of Korca Plain Irrigation

- Drainage Networkin an area of about 25000 hectares

- 56 km of Primary, and 181.5 Km of Secondary canals

- 25 Km access roads.

Completed

23

Study and Design of the Hirschhagen Auto Tunnel

Germany

- 2 lanes in 4.1 Km

Completed

24

Studies of Stuttgart Metro Tunnel Construction

Germany

- Line length: 130 Km (2013)

- Track gauge: 1,435 mm

Completed

25

Hydrographic Studies of Gao Bridge on Gao River

Mali

Financed by The Islamic Development Bank (IDB) and the Government of Mali

- Length of bridge: 290 m

- Length of access road: 15.8 Km

Completed

26

Design Review of Water Supply Program in the Cities of Attrah and Al-Darm in Sudan

Sudan

- Water Treatment Plant capacity: 600 liter/sec

- Population Coverage 300,000 person

Completed