INTERNATIONAL PROJECTS LIST
No |
Name |
Country |
Client |
Date |
Main Features |
Status |
||||||
1 |
Consulting services for Design Review, Construction Supervision, Quality Control & Contract Management for Construction of Head-works, Surge Shafts, Penstock and Power house |
Nepal |
Public Authority for Water |
2019-Today |
- Height of concrete barrage: 15 m - Installed capacity: 46.72 MW - Total annual energy to be generated: 384.51 GWh |
In Progress |
||||||
2 |
Consultancy Services for Feasibility Study of a Mini-hydropower Plant at Osborne Dam |
Zimbabwe |
Manako Power |
2018-Today |
- Dam type: Zoned earth-fill - Dam height: 66 m - Crest length: 1007 m |
Completed |
||||||
3 |
Design Review & Construction Supervision of Ilesa Integrated Water Supply and Sanitation Project |
Nigeria |
Osun State Water Corporation |
2017-Today |
Water Treatment Plant - Capacity: 60,000m3/day Conveyance pipeline - Pipeline: 32.4 km with Diameters of 400, 600, 800 mm |
In Progress |
||||||
4 |
Feasibility Studies for Mega Irrigation Schemes around Mt. Elgon Area and Design of Amagoro and Nabigaga Irrigation Schemes in Tororo and Kamuli Districts (Lot 1) |
Uganda |
Ministry of Water and Environment |
2018-Today |
- Command area: 3,200 hectares - Dam type: earth-fill - Dam height: 25 m |
In Progress |
||||||
5 |
Design Review and Construction Supervision of Contract Titled “Plant Design, Supply and Installation of St. Sebastian North Lock Gates and Pump Station” |
Sri Lanka |
Ministry of Urban Development Project Management Unit- Metro Colombo Urban Development |
2017- 2020 |
- Total direct pump capacity: 30.0 m3/s - Gate structure: 2 Nos. 7.5m x 6.2m sliding gate |
In Progress |
||||||
6 |
Construction Supervision of Moragahakanda Dam & Hydropower Plant |
Sri Lanka |
Ministry of Irrigation and Water Management of the Democratic Socialist Republic of Sri Lanka |
2015-2016 |
- Main Dam:Earth Core Rock fill Dam, Max. height: 62.3 m, - Saddle Dam: Roller compacted concrete gravity dam, Max. height: 50.5 m, - Power House : 4 Units - 10 MW (2*5 MW) |
Completed |
||||||
7 |
Engineering General Layout, Feasibility Studies, Detailed Design, Construction Supervision and Management of Uma Oya Dam and Hydropower Plant |
Sri Lanka |
Ministry of Irrigation and Water Management of the Democratic Socialist Republic of Sri Lanka |
2015-2016 |
Puhulpola Dam (Uma Oya River) - Dam Type: RCC - Dam Height: 35 m Dyraaba Dam ( Mahatotila River) - Dam Type: RCC - Dam Height 50 m - Installed capacity: 2 × 60 MW |
Completed |
||||||
8 |
Detailed Design and Construction Supervision of Kaluganga Dam & Hydropower Plant |
Sri Lanka |
Ministry of Irrigation and Water Management of the Democratic Socialist Republic of Sri Lanka |
2014-2015 |
- Main Dam: Rockfill with central core,Max. height: 68 m - Saddle Dam: Rockfill with central core,Max. height: 28m |
Completed |
||||||
9 |
Detailed Design Review and Construction Supervision of BajoliHoli Dam & HPP |
India |
Gmr Bajoli Holi Hydro Power Pvt. Ltd |
2014-2018 |
- Dam type: Concrete Gravity - Dam height: 63m - Installed capacity: 180 MW - 3 Nos. 60 MW - Diversion tunnel diameter: 5.6 m (length: 355 m) |
Completed |
||||||
10 |
Construction of Access Controlled Nagpur - Mumbai Super Communication Expressway (Maharashtra SamruddhiMahamarg)in From Km. 390.445 to Km. 444.485 |
India |
Gmr Bajoli Holi Hydro Power Pvt. Ltd |
2014-2018 |
- Number of tunnels 2 - Tunnel Diameter 9.7 m - Tunnel Length 267 m |
In Progress |
||||||
11 |
Design Review & Construction Supervision of Madinat Al Nahdah Flood Protection B4.1.1 / B4.1.2 DAM In WadiAday, Muscat Governorate |
Sultanate of Oman |
Ministry Of Regional Municipalities & Water Resources |
2019-Today |
Dam B4.1.1 comprises of 2 individual earth-fill dams - A main earth fill dam (MD), 22m high Dam B4.1.2 dam comprises in fact 3 individual earth-fill dams - A main dam (MD), 20m high |
Contract Negotiation |
||||||
12 |
Feasibility Study, Detailed Design & Construction Supervision of Flood Control Dam Scheme in SALALAH Free Zone, Raysut Area, Dhofar Governorate, Sultanate of Oman |
Sultanate of Oman |
Ministry Of Regional Municipalities & Water Resources |
2014-2017 |
|
In Progress |
||||||
13 |
Construction Supervision of Sang Tude II Dam & Hydropower Plant |
Tajikistan |
Sangab Company |
2006-2011 |
- Dam type: Rock fill with Clay core - Dam height 33.5 m - Installed Capacity: 220 MW |
Completed |
||||||
14 |
Feasibility Studies and Surveying Engineering for Ayni Dam & Hydropower Plant |
Tajikistan |
Farab Co. |
2010-2011 |
|
Completed |
||||||
15 |
Feasibility Study of Kama Irrigation and Diversion Dam and Hydropower Plant |
Afghanistan |
Islamic Republic Of Afghanistan Ministry of Energy & Water |
2008-2010 |
Dam - Dam Height: 7.5m - Installed Capacity of powerhouse : 45 MW Water conveyance system - Length: 16.7 KM - Discharge capacity: 125 m3/s - Number of tunnels: 4 (Diameter 7.8 m) Irrigation and drainage network - Command area: 5128 ha |
Completed |
||||||
16 |
Design Review and Construction Supervision for Reconstruction of Minge chevir Hydroelectric Power Plant Cascade and Varvara HPP |
Azerbaijan |
Azerenergi Joint Stock Company |
2008-2010 |
- Replacement of two 60 MW units with the new 70 MW units in Mingachevir HPP - Reconstruction of Varvara HPP increasing its capacity up to 21-22 MW |
Completed |
||||||
17 |
Geotechnical, Surveying, Meteorological and Hydrological Studies of Jiploo Dam & Hydropower Plant |
Equatorial Guinea |
ICON International Engineering and Contracting Group |
2002-2004 |
- Dam type: Gravity - Dam height: 22 m - Installed Capacity: 45 MW (3 × 15 MW) |
Completed |
||||||
18 |
Technical Design of Water Intake at Tigris River and Aindeevar Main Pump Station |
Syria |
The General Company For Hydraulic Studies of Syria |
2008-2010 |
- Commanding 150,000 hectares of irrigable land - Lifting head of 108m to an open canal of AinDeewar with the same capacity and 20.5 km length, to convey water - Lifting head of 63m from Al-Malkiahstation |
Completed |
||||||
19 |
Revising Geological and Hydro geological Studies of Al-Hussein Dam |
Syria |
General Company For Hydraulic Studies (GCHS Ltd.) |
2007-2009 |
- Dam Type: Earth fill dam with clay core - Dam Height: 68m |
Completed |
||||||
20 |
Detailed Design for Rehabilitation and Refurbishment of Al gharaffeh Pump Station and Reservoir Facilities |
Qatar |
Ministry of Electricity and Water |
1995-1999 |
- The network covers an area of more than 5,860,000sqms - The Network in consisted of 65Km main pipe and 2,360 manholes |
Completed |
||||||
21 |
Detailed Design for Rehabilitation and Refurbishment of Old Airport Reservoir – Al Wakrah |
Ministry of Electricity and Water |
1995-1999 |
- Construction of 0.5 Million Gallons capacity water Tower - Tanker filling station of 12 point, extendible to 24 points |
Completed |
|||||||
22 |
Detailed Design and Construction Supervision for Rehabilitation of Korca Irrigation & Drainage Network |
Albania |
Ministry of Agriculture & Food |
2011-2014 |
- Rehabilitation of 7000 hectares of Korca Plain Irrigation - Drainage Networkin an area of about 25000 hectares - 56 km of Primary, and 181.5 Km of Secondary canals - 25 Km access roads. |
Completed |
||||||
23 |
Study and Design of the Hirschhagen Auto Tunnel |
Germany |
- 2 lanes in 4.1 Km |
Completed |
||||||||
24 |
Studies of Stuttgart Metro Tunnel Construction |
Germany |
- Line length: 130 Km (2013) - Track gauge: 1,435 mm |
Completed |
||||||||
25 |
Hydrographic Studies of Gao Bridge on Gao River |
Mali |
Financed by The Islamic Development Bank (IDB) and the Government of Mali |
- Length of bridge: 290 m - Length of access road: 15.8 Km |
Completed |
|||||||
26 |
Design Review of Water Supply Program in the Cities of Attrah and Al-Darm in Sudan |
Sudan |
- Water Treatment Plant capacity: 600 liter/sec - Population Coverage 300,000 person |
Completed |